Church of Jesus Christ of Latter-day Saints, Temple Complex Expansion, New Central Plant, Salt Lake City, Utah
Cost analysis, systems alternatives study, and chiller design for a 19,000 sf, 7,500 ton design output, central plant using 4,800 tons of chiller capacity and 6,846 tons of future ice storage capacity to serve the new Assembly Hall and existing and future buildings
Lucille Erwin Middle School Chilled Water Plant, Loveland, Colorado – chilled water/ice thermal storage system
Design of an ice thermal storage chilled water system serving a large middle school (honors (3rd place) society (international) ASHRAE award, 2003 for New Institutional Buildings category). The design is a unique “flexible pumping” and valve system that uses only the necessary pumping energy for the task at hand. The system monitors building kW and has the ability to modulate the chilled water and ice system components to avoid setting monthly utility kW peaks. The system monitors remaining ice and uses that in calculations that save ice for the end of the day.
Denver Art Museum Chiller Upgrade, Colorado
Study and design to add two 600-ton chillers
Fitzsimons Redevelopment, Steam and Chilled Water Study, Aurora, Colorado
Life cycle study of steam plant, chilled water plant, and distribution alternatives for redevelopment of the Army Medical Center including 5,000,000 sf of relocated and new University of Colorado Health Sciences Center facilities
Great West Life Building Chiller Plant Expansion, Englewood, Colorado
Redesign to expand plant from 1,200 tons to 2,400 tons to accommodate 248,000 sf building addition and to provide backup capacity
IBM Corporation, Building 011 Chiller, Boulder, Colorado
2,000-ton chiller addition to main central plant serving 2.5-million sf industrial site
IBM Corporation, Shared Host Facility Chiller Plant, Boulder, Colorado
Design for a 5,000-ton plant with 32,000 gallons of chilled-water storage for a 295,000 gsf computer center, including coordination of control and fire protection systems
Lowry Air Force Base, Steam Distribution and Central Boiler Plant Master Plan, Aurora, Colorado
Energy study, field survey, and preparation of steam distribution record drawings
National Oceanographic and Atmospheric Administration Building Energy Upgrades, Colorado
Mechanical consulting services for energy improvements for the new NOAA building (evaluation of chiller and cooling tower alternatives as well as addenda documents for a high-efficiency chiller; control sequence to accommodate VAV box temperature offset during unoccupied periods) as part of Public Service Company of Colorado EPACT program
Plaza Tower Energy Study, Denver, Colorado
Energy study and follow-on design for hybrid heating retrofit, addition of absorption chillers, hydronic economizer, and gas radiant parking entrance snow melt for downtown high-rise building
University of Denver, Campus Energy Audit, Colorado
Review of utility systems serving buildings on two campuses with design recommendations
Air Force Academy Hospital
Master plan update
Colorado School of Mines
Master plan for mechanical, life safety, and tunnel piping
Buckley Air National Guard Base
Master plan, mechanical systems including central steam plant